mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Drivetrain - Front End Clicking Noises At Slow Speeds|Page 4171 > < Drivetrain - Front End Clicking Noises At Slow Speeds|Page 4169
Page 2
background image

6. Position the EBJ boot band (small) so that there is even clearance at either end (A and B).

CAUTION:
^

Secure the driveshaft in an upright position and clamp part of the boot band to be crimped securely in the jaws of the special tool
MB991561.

^

Crimp the boot band until special tool MB991561 touches the stopper.

7. Use special tool MB991561 to crimp the boot band (small).

8. Check that the crimping amount (C) of the boot band is at the standard value.

Standard value (C): 2.4 - 2.8 mm (0.10 - 0.11 inch)

If the crimping amount is larger than 2.8 mm (0.11 inch)
Readjust the value of (W) in step 5 according to the following formula, and then repeat the operation in step 7.
W = 5.5 mm (0.22 inch) - C
Example: If C = 2.9 mm (0.11 inch), then W = 2.6 mm (0.10 inch)
If the crimping amount is smaller than 2.4 mm (0.10 inch)
Remove the EBJ boot band, readjust the value of (W) in step 5 according to the following formula, and then repeat the operations in
steps 6 and 7 using a new EBJ boot band.
W = 5.5 mm (0.22 inch) - C
Example: If C = 2.3 mm (0.09 inch), then W = 3.2 mm (0.13 inch)

9. Check that the boot band is not sticking out past the place where it has been installed. If the boot band is sticking out, remove it and then repeat

steps 6 to 8, using a new boot band.

CAUTION: The driveshaft joint uses special grease. Do not mix old and new or different types of grease.

10. Fill the inside of the boot with the specified amount of the specified grease.

Drivetrain - Front End Clicking Noises At Slow Speeds|Page 4171 > < Drivetrain - Front End Clicking Noises At Slow Speeds|Page 4169