mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Engine, A/T Controls - A/T In Limp-In Mode On Start Up|Page 1911 > < Engine, A/T Controls - A/T In Limp-In Mode On Start Up|Page 1909
Page 3
background image

Click on "Download". After the download completes, click on "Cancel" to exit the "Maintenance" window.

GO TO THE REPROGRAMMING PROCEDURE.

For Stand-alone MUT-III users only:

Check to see that your MUT-III version is at 22.0 or higher. If it is not at version 22.0 or higher, locate your MUT-III Scan Tool Viewer version 22.0
CD, and follow the instructions printed on the disc to update the laptop.

REPROGRAMMING PROCEDURE

BATTERY VOLTAGE MUST BE MAINTAINED BETWEEN 13.2 AND 13.5 VOLTS. CHECK THE CONDITION OF THE BATTERY AND
CHARGE IT IF NECESSARY. CONNECT A BATTERY CHARGER SET TO CONTINUOUS CHARGE TO THE BATTERY. DO NOT ALLOW
THE CHARGER TO "TIME OUT" DURING THE REPROGRAMMING PROCESS.

DO NOT ALLOW THE CHARGING VOLTAGE TO EXCEED 13.5 VOLTS DURING THE PROCESS.

1. Connect the equipment as follows:

a. Start the laptop computer.

b. Connect the USB cable to the VCI.

c. Connect the USB cable to the laptop.

d. Connect the blue MUT-III main harness to the VCI.

e. Connect the other end of the blue MUT-III main harness to the vehicle's data link connector.

f. Turn the VCI power switch ON. Verify that the indicator lamp in the upper right corner of the screen is green.

NOTE

Engine, A/T Controls - A/T In Limp-In Mode On Start Up|Page 1911 > < Engine, A/T Controls - A/T In Limp-In Mode On Start Up|Page 1909