200SX L4-1998cc 2.0L DOHC MFI (SR20DE) (1995)
Multiple Junction Connector: Service and Repair
Super Multiple Junction (SMJ)-Installation
To install SMJ, tighten bolts until orange "fulltight" mark appears and then retighten to specified torque as required.
CAUTION: Do not overtighten bolts, otherwise, they may be damaged.