nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Steering Wheel > < Power Rack & Pinion|Page 7678
Page 2
background image

Fig. 4 Tie Rod Length Adjustment

ASSEMBLE

When assembling manual steering gear, refer to Fig. 2, noting the following:
1. Install rack gear from rack side, then place rack gear in neutral position.
2. Install pinion assembly, then with pinion rack held in place, install guide clip as shown in Fig. 3.
3. Apply suitable locking compound to threaded portion of rear cover, then install rear cover using a suitable tool.
4. Apply suitable grease to sealing lips of dust seal, then wrap suitable tape around pinion gear and install dust seal.
5. Apply suitable sealing compound to threaded portion of retainer cover, then install retainer, spring and retainer cover.
6. Adjust pinion rotating torque as follows:

a. Place gear in neutral position and loosen locknut, then  torque adjusting screw to 43 inch lbs.
b. Loosen adjusting screw, then re to 1.74 inch lbs.
c. Move rack over its entire stroke several times, then return to neutral position.
d. Measure pinion rotating torque within a range of &plusmn;180° from neutral position. Find position where rotating torque is at its maximum.
e. Loosen adjusting screw at position where rotating torque is at its maximum, then hand tighten adjusting screw until its end touches retainer.
f.

Torque locknut to 6-8 ft. lbs. while holding adjusting screw in position. Ensure adjusting screw does not rotate.

g. While rotating pinion in the +/- 100° range from neutral position, ensure rotating torque is 6-10 inch lbs.
h. If pinion rotating torque is not as specified, readjust as required. If correct adjustment can not be obtained, replace retainer spring.

7. Apply suitable locking compound to threaded portion of tie rod inner socket, then install inner socket into rack end together with new lock plate.  

Ensure lock plate ratchet enters groove at end portion of rack.

8. Tighten tie rod inner socket, then bend lock plate at two cutout portions of inner socket. Remove burrs after bending lock plate to prevent

damaging boot.

9. Tighten outer socket locknut so tie rod length "L" is 6.94 inches and screwed length "L" is 0.98 inch or more, Fig. 4

10. Measure rack stroke. Ensure stroke is 2.894 inches on both sides.
11. Apply suitable sealing compound to contact surfaces between boot and gear housing, then install boot and boot clamps. Ensure boot clamps do

not interfere with any other parts. Also, use caution not to twist boot.

Steering Wheel > < Power Rack & Pinion|Page 7678