nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

All Technical Service Bulletins for A/C Coupler O-ring:|97-013 > < A/C - New Connections & O-Rings|Page 8980
Page 4
background image

CAUTION:

When installing high pressure tubes (with flange connections) to their mating parts, make sure the flange is fully seated onto the mating part before
the securing bolt is installed and tightened (see Figure 4). If the securing bolt is installed and tightened before the tube flange is seated onto its mating
part, 0-ring damage and leaks can result.

All Technical Service Bulletins for A/C Coupler O-ring:|97-013 > < A/C - New Connections & O-Rings|Page 8980