nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Thermotime Switch|Page 1537 > < Thermotime Switch|Page 1535
Page 1
background image

Thermo Time Switch: Testing and Inspection
Bimetallic Heater Coil of Thermotime Switch

1. Connect ohmmeter between terminal 26 of EFI harness connector and ground
2. Meter should read 40-70 ohms.
3. If reading is not within specification, check wiring harness between thermotime switch and control unit. If wiring is satisfactory, check thermotime

switch as outlined in "Component Testing".

Thermotime Switch|Page 1537 > < Thermotime Switch|Page 1535