Altima L4-2.5L (QR25DE) Hybrid (2007)
1. Insert the amount of grease (Genuine NISSAN Grease or equivalent) into joint sub-assembly serration hole until grease begins to ooze from ball
groove and serration hole. After inserting grease, use a shop cloth to wipe off old grease that has oozed out.
2. Cover serrated part of shaft with tape. Install new boot band and boot to shaft. Be careful not to damage boot.
CAUTION:
Discard old boot band and boot; replace with new one.
3. Remove protective tape wound around serrated part of shaft.
4. Attach new circlip to shaft. The circlip must fit securely into shaft groove. Attach nut to joint sub-assembly.
Use a suitable tool to press-fit.
CAUTION:
Discard old circlip and replace with new one.
5. Insert the amount of new grease (Genuine NISSAN Grease or equivalent) listed below into housing from large end of boot.
Grease amount: 170 - 190 g (6.00 - 6.70 oz)