nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Removal and Replacement|Page 4662 > < Removal and Replacement|Page 4660
Page 12
background image

Wheel Side

1. Insert the amount of grease (Genuine NISSAN Grease or equivalent) into joint sub-assembly serration hole until grease begins to ooze from ball

groove and serration hole. After inserting grease, use a shop cloth to wipe off old grease that has oozed out.

2. Cover serrated part of shaft with tape. Install new boot and boot band onto shaft. Be careful not to damage boot.

CAUTION:
Discard old boot and boot band; replace with new ones.

3. Remove protective tape wound around serrated part of shaft.

4. Attach new circlip to shaft. The circlip must fit securely into shaft groove. Attach nut to joint sub-assembly

Use a suitable tool to press-fit.

CAUTION:
Discard old circlip; replace with new ones.

5. Insert the amount of new grease (Genuine NISSAN Grease or equivalent) listed below into housing from large end of boot.

Grease amount: 170 - 190 g (6.00 - 6.70 oz)

Removal and Replacement|Page 4662 > < Removal and Replacement|Page 4660