nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Vacuum Cut Valve, Evaporative System > < Refueling Vapor Cut Valve|Testing and Inspection
Page 2
background image

d. Apply vacuum pressure to both hose ends A and B [-13.3 kPa (-100 mmHg, -3.94 inHg)] with fuel gauge retainer remaining open and check

that the pressure is applicable.

Vacuum Cut Valve, Evaporative System > < Refueling Vapor Cut Valve|Testing and Inspection