nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Deployment and Disposal|Page 10935 > < Technician Safety Information|Page 10932
Page 1
background image

Seat Belt Pre-Tensioner: Service and Repair
Deployment and Disposal

Checking Deployment Tool

Connecting to Battery

CAUTION: The battery must show voltage of 9.6 V or more.

Remove the battery from the vehicle and place it on dry wood blocks approximately 5 m (16 ft) away from the vehicle.

*

Wait 3 minutes after the vehicle battery is disconnected before proceeding.

*

Connect red clip of deployment tool to battery positive terminal and black clip to negative terminal.

CAUTION: Make sure the polarity is correct. The right side lamp in the tool marked "deployment tool power" should glow with a green light. If the

right side lamp glows red, reverse the connections to the battery.

Air Bag Deployment Tool Lamp Illumination Chart (Battery Connected)

Deployment Tool Check

Press the deployment tool switch to the ON position.
The left side lamp in the tool, marked "air bag connector voltage" should illuminate.
If it does not illuminate, replace the tool.

Deployment of Seat Belt PreTensioner (Outside Vehicle)

DEPLOYMENT PROCEDURES FOR SEAT BELT PRE-TENSIONER (OUTSIDE OF VEHICLE)

Deployment and Disposal|Page 10935 > < Technician Safety Information|Page 10932