nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Control Valve Assembly and Accumulators|Page 8475 > < Control Valve Assembly and Accumulators|Page 8473
Page 2
background image

Bolt length, number and location: 

1. Remove bolts a, d and nut f and remove oil strainer from control valve assembly.

2. Remove solenoid valve assembly and line pressure solenoid valve from control valve assembly.

3. Remove O-rings from solenoid valves and terminal body.

Control Valve Assembly and Accumulators|Page 8475 > < Control Valve Assembly and Accumulators|Page 8473