nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Control Valve Assembly and Accumulators|Page 8481 > < Control Valve Assembly and Accumulators|Page 8479
Page 8
background image

 Bolt length, number and location: 

a. Install and tighten bolts b to specified torque.

:°7 - 9 Nm (0.7 - 0.9 kg-m, 61 - 78 inch lbs.) 

b. Install solenoid valve assembly and line pressure solenoid valve to lower body.

c. Set oil strainer, then tighten bolts a, c, d and nuts f to specified torque.

7 - 9 Nm (0.7 - 0.9 kg-m, 61 - 78 inch lbs.) 

Control Valve Assembly and Accumulators|Page 8481 > < Control Valve Assembly and Accumulators|Page 8479