Altima 2.5 L4-2.5L (QR25DE) (2002)
^
After checking the full-open lift amount, lower the water temperature and check the valve closing temperature.
Standard values
INSTALLATION
Installation is in the reverse order of removal.
^
Install the water control valve with the whole circumference of the flange part fitting securely inside the rubber ring.
^
Install the water control valve with the up-mark facing up and the frame center part facing upwards. The position deviation may be within the
range of +/-10°.