nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Power Distribution Relay > < Grounding Point|Locations|Page 11806
Page 1
background image

Multiple Junction Connector: Service and Repair

SMJ INSTALLATION

To install SMJ, tighten bolts until orange "fulltight" mark appears and then retighten to specified torque as required.

Tightening Torque : 3 - 5 N.m (0.3 - 0.5 kg-m, 26 - 43 in-lb)

CAUTION:  Do not overtighten bolts, otherwise, they may be damaged.

Power Distribution Relay > < Grounding Point|Locations|Page 11806