Altima 2.5 SL L4-2.5L (QR25DE) (2002)
Air Door Actuator / Motor: Adjustments
CONTROL LINKAGE ADJUSTMENT
1. Install intake door motor on blower unit.
Ensure that the intake door motor lever is fitted into the slit portion of intake door link.
2. Connect the intake door motor harness connector.
3. Turn ignition switch to ON.
4. Check that intake door operates properly when RECIRCULATION switch is turned ON and OFF.