nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Engine Controls - No Start after Cold Soak|Page 10302 > < Engine Controls - No Start after Cold Soak|Page 10300
Page 5
background image

^

This will add the data you selected to the "File(s) Selected" list.

4.

Click on "Continue" and follow directions to perform "data transfer" (download) from ASIST into CONSULT-II.

Step Two: Preparation for Reprogramming ECM

1.

Connect a battery charger on trickle (low) charge setting to the vehicle's battery.

CAUTION:

For numbers 2 and 3 below: DO NOT connect the CONSULT-II AC power supply. 

2.

Press [SUB MODE] (see Figure B) then:

a.

From the listed items, find and select [BATTERY CHARGE].

3.

Check the CONSULT-II's "Charger Input" reading (see Figure C).

NOTE:

^

"Battery Voltage" is the voltage level of CONSULT-II's battery.

^

"Charger Input" is the voltage level of the vehicle's battery. (It must be above 12 volts.)

Step Three: Reprogram the Vehicle ECM

Step Four: "Wrap-up" After Reprogramming is Finished

1.

Turn the ignition switch "OFF" and CONSULT-II "OFF".

2.

Wait more than 10 seconds, then:

Engine Controls - No Start after Cold Soak|Page 10302 > < Engine Controls - No Start after Cold Soak|Page 10300