Altima 2.5 SL L4-2.5L (QR25DE) (2002)
D.
Touch [SET TIME] (see Figure 2).
1)
If time is not correct, touch the [HOUR], [MINUTE] or [AM/PM] as needed. Then adjust it by using arrow keys. Once done, press
[SAVE], press [BACK] and go to step 5.
2)
If time is OK, press [BACK] and go to step 5.
IMPORTANT NOTE
^
If your ASIST PC is already being used to perform ECM reprogramming, proceed to step 5.
^
If you are unsure whether your ASIST PC has already been set up for ECM reprogramming, look in ASIST, under "CONSULT Utilities" -
"CONSULT-II Info" - "NISSAN" - "ECU Reprogramming". This will give you instructions for setting the Ethernet (IP) Address of the ASIST
PC and CONSULT-II. You will need to do this before performing ECM reprogramming.
DOWNLOAD (TRANSFER) DATA FROM ASIST INTO CONSULT-II
5.
From the ASIST PC main menu screen, select "CONSULT UTILITIES" (see Figure 3).
6.
From the "CONSULT UTILITIES" screen, select "ECM/TCM DATA" (see Figure 4).