Altima 2.5 SL L4-2.5L (QR25DE) (2002)
Constant Velocity Joint: Service Precautions
Precautions
^
When installing rubber parts, final tightening must be carried out under unladen condition* with tires on ground. *: Fuel, radiator coolant and
engine oil full. Spare tire, jack, hand tools and mats in designated positions.
^
After installing removed suspension parts, check wheel alignment and adjust if necessary.
^
Use flare nut wrench when removing or installing brake tubes.
^
Always torque brake lines when installing.