nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Available Bearings, Clearance and ID Color|Page 2017 > < Available Bearings, Clearance and ID Color|Page 2015
Page 2
background image

1. Place engine on a work stand.
2. Remove timing chains.

3. Remove pistons with connecting rods.

-

To disassemble piston and connecting rod, first remove snap, rings. Heat piston to 60 to 70°C (140 to 158°F) then use piston pin press to
remove pin.

CAUTION: 
-

When piston rings are not replaced, make sure that piston rings are mounted in their original positions.

-

When piston rings are being replaced and no punchmark is present, piston rings can be mounted with either side up.

4. Remove main bearing cap and crankshaft.

-

Before removing main bearing cap, measure crankshaft end play. 

-

Bolts should be loosened in two or three steps in numerical order as shown.

INSPECTION 

Piston And Piston Pin Clearance 

Available Bearings, Clearance and ID Color|Page 2017 > < Available Bearings, Clearance and ID Color|Page 2015