nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

EGR-BPT Valve - Bracket Broken and Rattling|Page 3957 > < EGR-BPT Valve - Bracket Broken and Rattling
Page 2
background image

5.

Install the replacement lower bracket onto the collector using the replacement lower bracket bolt (see the PARTS INFORMATION Section of this
bulletin).

NOTE

Position the bracket midway between the EGR valve base and BPT exhaust tube (see Figure 2).

6.

Tighten the replacement lower bracket bolt to 70 kg-cm (60 in-lb.).

NOTE

Hold the bracket while tightening the replacement bolt to assure that the bracket remains positioned midway between the EGR valve and BPT
exhaust tube.

7.

Re-install the BPT valve and upper bracket onto the lower bracket using the two original upper bracket bolts (removed in Step 3). Torque the bolts
to 70 kg-cm (60 in-lb.).

NOTE

Ensure that the lower bracket does not contact the EGR valve base or the BPT exhaust tube.

8.

Start the vehicle and verify that the rattle noise is gone.

PARTS INFORMATION

CLAIMS INFORMATION

Submit a Primary Failed Part (PP) line using the claims coding shown.

EGR-BPT Valve - Bracket Broken and Rattling|Page 3957 > < EGR-BPT Valve - Bracket Broken and Rattling