nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Available Bearings, Clearance and ID Color|Page 2026 > < Available Bearings, Clearance and ID Color|Page 2024
Page 11
background image

2. Heat piston to 60 to 70°C (140 to 158°F) and assemble piston, piston pin, connecting rod and new snap ring.

-

Align the direction of piston and connecting rod.

-

Numbers stamped on connecting rod and cap correspond to each cylinder.

-

After assembly, make sure connecting rod swings smoothly.

3. Set piston rings as shown.

CAUTION: 
-

When piston rings are not being replaced, make sure that piston rings are mounted in their original positions.

-

When piston rings are being replaced and no punchmark is present, piston rings can be mounted with either side up.

-

Align piston rings so that end gaps are positioned as shown.

Crankshaft 

1. Set main bearings in their proper positions on cylinder block and main bearing cap.

-

Confirm that correct main bearings are used. 

-

Apply new engine oil to bearing surfaces.

Available Bearings, Clearance and ID Color|Page 2026 > < Available Bearings, Clearance and ID Color|Page 2024