nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Body and Frame|Grille > < Rear Subframe|Service and Repair|Page 5773
Page 4
background image

-

To connect the rear load leveling air suspension hoses, the lock ring must be fully seated in the fitting. Insert the hose "B" into the lock ring "A"
until the lock ring "A" is touching the hose "B" as shown. Pull on the hose to check that it is securely inserted.

-

Perform final tightening of nuts and bolts for the links (rubber bushing) under unladen condition (unladen condition means that the fuel tank,
engine coolant and lubricants are at the full specification, and the spare tire, jack, hand tools, and mats are in their designated positions) with the 
tires on level ground.

-

Check the wheel alignment. Refer to See: Maintenance/Alignment/Service and Repair/Rear Suspension

Body and Frame|Grille > < Rear Subframe|Service and Repair|Page 5773