nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Exploded View|Page 1347 > < Exploded View|Page 1345
Page 11
background image

-

D: Intake side

-

White Arrow: Front

a. Tighten the RH (A) and LH (B) front cover bolts (4 for each bank) as shown to the specified torque.

Front cover bolts : 11.0 N.m (1.1 kg-m, 8 ft-lb)

5. Install the camshaft sprockets using the following procedure:

-

A: LH bank shown

a. Install the camshaft sprockets aligning them with the matching marks painted on the timing chain (B) and the camshaft sprockets (C) before

removal. Align the camshaft sprocket key groove with the dowel pin on the camshaft front edge at the same time.
Then temporarily tighten camshaft sprocket bolts.

-

Install the intake (VTC) (A) and exhaust (B) side camshaft sprockets by selectively using the groove of the dowel pin according to the bank for the
exhaust (B) side camshaft sprockets. (Common part used for both exhaust banks.)

-

A: Intake (VTC)

-

B: Exhaust

-

R: for RH bank

-

L: for LH bank

b. Lock the hexagonal part of the camshaft in the same way as for removal, and tighten the camshaft sprocket bolts.
c. Check again that the timing alignment mark on the timing chain and on each sprocket are aligned.

Exploded View|Page 1347 > < Exploded View|Page 1345