nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 2162 > < Valve Clearance|Specifications|Page 2160
Page 3
background image

NOTE:
Firing order 1-8-7-3-6-5-4-2

-

No. 3 cylinder compression TDC

-

Measure valve clearance using suitable tool. Refer to See: Engine, Cooling and Exhaust/Engine/Specifications/General Specification.

CAUTION:
If the inspection was carried out with a cold engine, make sure the values with a fully warmed up engine are still within specifications.

10. Turn the crankshaft pulley clockwise 90° from the position of No. 3 cylinder compression TDC (clockwise by 360° from the position of No. 1

cylinder compression TDC) to measure the intake and exhaust valve clearances of No. 6 cylinder (G) and the exhaust valve clearance of No. 2
cylinder (E).

-

White Arrow : Engine front

-

A: RH

-

B: LH

-

C: Exhaust

-

D: Intake

-

E: No. 2 cylinder

-

F: No. 4 cylinder

-

G: No. 6 cylinder

-

H: No. 8 cylinder

Valve Clearance|Specifications|Page 2162 > < Valve Clearance|Specifications|Page 2160