nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Automatic Air Conditioner|Page 4164 > < Automatic Air Conditioner|Page 4162
Page 6
background image

Arrow Indicates : Vehicle front

-

The A/C auto amp. sends the control signal to Intake door motor.

When intake door motor receives the control signal, intake door is moved to appropriate position by PBR (Potentio Balance Resistor) opening angle
indication signal.

Intake door motor circuit

INTAKE DOOR MOTOR

Diagnosis Procedure

POWER SUPPLY CIRCUIT
1.CHECK INTAKE DOOR MOTOR DRIVE SIGNAL
1. Turn the ignition switch ON.
2. Check voltage between intake door motor harness connector and the ground when intake switch is operated.

Is inspection result normal?
YES  - GO TO 4.
NO - GO TO 2.
2.CHECK CONTINUITY BETWEEN A/C AUTO AMP. AND INTAKE DOOR MOTOR
1. Turn the ignition switch OFF.
2. Disconnect the A/C auto amp. connector.
3. Disconnect the intake door motor connector.
4. Check continuity between A/C auto amp. harness connector and intake door motor harness connector.

Is inspection result normal?
YES  - GO TO 3.
NO - Repair the harnesses or connectors.
3.CHECK CONTINUITY BETWEEN INTAKE DOOR MOTOR AND GROUND
Check continuity between intake door motor harness connector and the ground.

Automatic Air Conditioner|Page 4164 > < Automatic Air Conditioner|Page 4162