nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Draining|Page 889 > < Draining|Page 887
Page 2
background image

6. Refill reservoir tank to "MAX" level line with engine coolant.

7. Install air duct (between air cleaner case and electric throttle control actuator).  See: Filters/Air Cleaner Housing/Service and Repair/Exploded

View.

8. Install radiator cap.
9. Warm up engine until opening thermostat. Standard for warming-up time is approximately 10 minutes at 
3,000 rpm.
-

Check thermostat opening condition by touching radiator hose (lower) to see a flow of warm water.

CAUTION:
Watch water temperature gauge so as not to overheat engine.

10. Stop the engine and cool down to less than approximately 50°C (122°F).

-

Cool down using fan to reduce the time.

-

If necessary, refill radiator up to filler neck with engine coolant.

CAUTION:
Never adhere the engine coolant to electronic equipments (alternator etc.).

11. Refill reservoir tank to "MAX" level line with engine coolant.
12. Repeat steps 5 through 10 two or more times with radiator cap installed until engine coolant level no longer drops.
13. Check cooling system for leakage with engine running.
14. Warm up the engine, and check for sound of engine coolant flow while running engine from idle up to

3,000 rpm with heater temperature controller set at several position between "COOL" and "WARM".
-

Sound may be noticeable at heater unit.

15. Repeat step 14 three times.
16. If sound is heard, bleed air from cooling system by repeating step 5 through 10 until reservoir tank level no longer drops.

Draining|Page 889 > < Draining|Page 887