nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Emissions - MIL ON/DTC's P0442/P0455/P0456/P1446|Page 8404 > < Emissions - MIL ON/DTC's P0442/P0455/P0456/P1446|Page 8402
Page 5
background image

6.

Prep the holes you just drilled as follows:

a.

Remove burs from the edges with a file or sandpaper.

b.

Clean the holes with solvent and allow to completely dry.

c.

Apply / cover all bare metal with Zinc Rich primer (see Parts Information for Zinc Rich primer).

d.

Alloy primer to dry-approximately 1 hour.

7.

Prepare the bracket for installation as follows:

a.

Assemble the collapsible nut, spacer nut, and bolt as shown in Figure 3.

b.

Finger tighten the assembly in Figure 3.

c.

Install / push the nut and bolt assembly into the bracket as shown in Figure 4.

Emissions - MIL ON/DTC's P0442/P0455/P0456/P1446|Page 8404 > < Emissions - MIL ON/DTC's P0442/P0455/P0456/P1446|Page 8402