Frontier 2WD L4-2.5L (QR25DE) (2005)
6.
Prep the holes you just drilled as follows:
a.
Remove burs from the edges with a file or sandpaper.
b.
Clean the holes with solvent and allow to completely dry.
c.
Apply / cover all bare metal with Zinc Rich primer (see Parts Information for Zinc Rich primer).
d.
Alloy primer to dry-approximately 1 hour.
7.
Prepare the bracket for installation as follows:
a.
Assemble the collapsible nut, spacer nut, and bolt as shown in Figure 3.
b.
Finger tighten the assembly in Figure 3.
c.
Install / push the nut and bolt assembly into the bracket as shown in Figure 4.