Frontier 2WD L4-2.5L (QR25DE) (2005)
DO NOT DISCONNECT THE ETHERNET CABLE UNTIL "COMPLETE" IS DISPLAYED AS SHOWN IN FIGURE 9 ABOVE.
11. When transfer is complete (see Figure 9):
A. Select (click on) "Okay", then "MAIN MENU".
B. Turn "OFF" CONSULT-II.
C. Disconnect the AC power cord and the Ethernet cable from CONSULT-II.
Download New Data From Consult-II Into the Vehicle
DOWNLOAD NEW DATA FROM CONSULT-II INTO THE VEHICLE (REPROGRAM ECM)
CAUTION:
^ Perform this operation in four (4) sections. DO NOT SKIP any of these sections.
^ They must be performed in order, 1 through 4.
Section 1: Connect a battery charger and CONSULT-II to the vehicle.
Section 2: Confirm the vehicle battery voltage and CONSULT-II "Charger Input".
Section 3: Perform ECM Reprogramming.
Section 4: Perform ECM Reprogram Confirmation.
Section 1: Connect a battery charger and CONSULT-II to the vehicle.
12. Confirm the ignition switch is "OFF".
13. Connect a battery charger to the vehicle battery.
A. Set the charger at a low charge rate (trickle charge).
IMPORTANT