nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Computers and Control Systems > < Valve Clearance|Specifications|Page 5531
Page 2
background image

5. Install the selected valve lifter.
6. Install camshaft. Refer to "INSTALLATION".
7. Manually rotate crankshaft pulley a few rotations.
8. Make sure that valve clearances for cold engine are within specifications by referring to the specified values. Refer to INSPECTION.
9. Installation of the remaining components is in reverse order of removal.

10. Warm up the engine, and check for unusual noise and vibration.

Computers and Control Systems > < Valve Clearance|Specifications|Page 5531