nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Throttle Full Close Switch > < Supercharger|Diagrams|Page 5897
Page 4
background image

1. Apply air pressure of less than 12 kPa (90 mmHg, 3.54 in-Hg) to the supercharger bypass valve actuator's lower side hose port and check for any

leakage

2. Check the supercharger bypass valve actuator rod for smooth movement while maintaining the pressure at the specified levels below:

Rod starts to extend at approximately: 12 kPa (90 mmHg, 3.54 in-Hg) 
Rod is fully extended at approximately: 33.3 kPa (250 mmHg, 9.84 in-Hg) 
Rod full extended length: 20.83 - 22.71 mm (0.82 - 0.89 inch) 

Installation 

Installation is in the reverse order of removal.
^

Replace all gaskets; make sure that all gasket surfaces are clean and undamaged.

^

Follow all torque sequences for tightening nuts and bolts.

^

Refill the cooling system. 

Throttle Full Close Switch > < Supercharger|Diagrams|Page 5897