nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Hydraulic System Preliminary Procedures|Page 11042 > < Hydraulic System Preliminary Procedures|Page 11040
Page 2
background image

^

Remove connector and flow control valve with spring.

^

Be careful not to drop control valve.

Inspection 

^

If fluid leak is found around the pulley shaft, replace the oil seal.

^

If pulley is cracked or deformed, replace it.

Assembly 

Assemble oil pump, noting the following instructions.
^

Make sure O-rings and oil seal are properly installed.

^

Always install new O-rings and oil seal.

^

Be careful of oil seal direction.

^

Cam ring, rotor and vanes must be replaced as a set if necessary.

^

When assembling, coat each part with Genuine Nissan PSF II or equivalent.

^

Pay attention to the direction of rotor.

^

When assembling vanes to rotor, rounded surfaces of vanes must face cam ring side.

Hydraulic System Preliminary Procedures|Page 11042 > < Hydraulic System Preliminary Procedures|Page 11040