nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Campaign - A/C Hose Replacement|Page 8106 > < Campaign - A/C Hose Replacement|Page 8104
Page 6
background image

Use a backup wrench on the low hose when tightening the joint connection nut.

8.

Reinstall the clip to the support bracket (see Figure 2). Tighten the clip mounting bolt to 3.8 - 4.5 N.m (0.4 - 0.5 Kg-m, 33 - 40 in-lb).

9.

Evacuate and recharge the vehicle's A/C system with 0.60 - 0.70 kg (1.32-1.54 lb) of R134a refrigerant. Refer to page HA-51 of the 1998 Frontier
Service Manual for the A/C evacuation and recharge procedure.

10.

Check the A/C low hose for refrigerant leaks. Refer to pages HA-48 through HA-50 of the 1998 Frontier Service Manual for the A/C leak test
procedure. If a leak is found, repair as necessary before proceeding with step 11.

11.

Check A/C performance. Refer to page HA-38 of the 1998 Frontier Service Manual for the A/C performance check procedure.

A.

If the A/C performance is within specification, this service procedure is complete.

B.

If the A/C performance is not within specification, repair as necessary.

Low Hose Angle Adjustment

1.

Loosen the joint connection between the A/C low hose and the mating A/C low pipe by turning the joint connection nut 1/4 turn counterclockwise
(see Figure 4).

CAUTION

Do not loosen the joint connection nut more than 1/4 turn as refrigerant can escape and the 0-ring may become damaged. Also, use a backup wrench
on the hose when loosening the joint connection nut.

2.

Loosen (but do not remove) the bolt that secures the clip to the support bracket (see Figure 4).

3.

Move the A/C low hose so that it is positioned between 0° and 5° relative to the horizontal plane (see Figure 5).

4.

Retighten the clip mounting bolt to 3.8 - 4.5 N.m (0.4 - 0.5 Kg-m, 33 - 40 in-lb)

Campaign - A/C Hose Replacement|Page 8106 > < Campaign - A/C Hose Replacement|Page 8104