nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Campaign - A/C Hose Replacement|Page 1573 > < Campaign - A/C Hose Replacement|Page 1571
Page 5
background image

2.

Disconnect the A/C low hose from the A/C compressor and from the A/C low pipe coming from the evaporator (see Figure 2).

3.

Remove the clip from the support bracket (see Figure 2).

4.

Remove the old hose from the vehicle.

5.

Apply Nissan A/C system oil "Type R" (P/N: KLH00-PAGR0) to the 0-ring on the compressor end of the new hose and to the 0-ring on the
existing A/C low pipe (coming from the evaporator).

NOTE

If it is necessary to replace the 0-ring on either the new A/C low hose or the existing low pipe, use the correct 0-ring specified for "Captured 0-ring"
type A/C connections (0-ring P/N: 92473-N8210).

6.

Install the compressor end of the new A/C low hose to the compressor (see Figure 2) and tighten the mounting bolt to 14 - 18 N.m (1.4 - 1.8 kg-m,
10 - 13 ft-lb).

7.

Install the other end of the A/C low hose to the existing A/C low pipe so that the hose is positioned between 0° and 5° relative to the horizontal
plane (see Figure 3). Tighten the joint connection nut to 20 - 29 N.m (2.0 - 3.0 kg-m, 14 - 22 ft-lb).

CAUTION

Campaign - A/C Hose Replacement|Page 1573 > < Campaign - A/C Hose Replacement|Page 1571