nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Service Specifications|Page 1881 > < Service Specifications|Page 1879
Page 2
background image

-

Be careful not to damage cylinder head gasket.

-

Be sure to install new front oil seal.

7. Install the following parts:

-

Crankshaft pulley Oil strainer and oil pan.

-

Component parts below the engine.

-

A/C compressor idler pulley.

-

New cylinder head gasket.

-

Idler shaft.

8. Install the oil pump.

-

Make sure the flat side of the distributor drive shaft is facing the engine.

9. Install cylinder head and temporarily tighten cylinder head bolts when installing front cover.

-

Apply new engine oil to bolt threads and seat surfaces.

-

Temporarily tighten cylinder head bolts. This is necessary to avoid damaging cylinder head gasket.

-

Be sure to install washers between bolts and cylinder head.

UPPER TIMING CHAIN 

1. Install lower timing chain.

2. Install upper timing chain, chain tensioner.

-

Set upper timing chain on the idler sprockets, aligning mating marks.

-

When installing chain tensioner, insert a suitable pin into pin hole to stop piston.

Service Specifications|Page 1881 > < Service Specifications|Page 1879