nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Sensors and Switches - Transmission and Drivetrain > < Diagram Information and Instructions|Page 6265
Page 1
background image

Torque Converter Clutch Solenoid: Testing and Inspection

COMPONENT INSPECTION 
Torque Converter Clutch Solenoid Valve

1. Check resistance between torque converter clutch solenoid valve terminals (1) and (3).

Resistance: Approximately 25 Ohms [at 25° C (77° F)] 

2. Remove torque converter clutch solenoid valve. 
3. Supply the solenoid valve terminals (1) and (3) with battery voltage and check the solenoid valve operation. Torque converter clutch solenoid

valve should be operated.

4. If NG, replace torque converter clutch solenoid valve.

Torque Converter Clutch Control Valve

1. Disassemble torque converter clutch control valve assembly.
2. Check torque converter clutch control valve.

-

Valve, and sleeve slide along valve bore under their own weight.

-

Valve, and sleeve are tree from burrs, dents and scratches.

-

Control valve springs are free from damage, deformation and fatigue.

-

Hydraulic line is tree from obstacles.

3. If NG, replace torque converter clutch control valve.

Sensors and Switches - Transmission and Drivetrain > < Diagram Information and Instructions|Page 6265