nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 5845 > < Diagram Information and Instructions|Page 5843
Page 6
background image

PRELIMINARY CHECK / Example

1. Before performing trouble diagnoses, read the "Preliminary Check", the "Symptom Chart" or the "Work Flow".

2. After repairs, re-check that the problem has been completely eliminated.

3. Refer to Component Parts and Harness Connector Location for the Systems described in each section for identification/location of components and

harness connectors.

4. Refer to the Circuit Diagram for quick pinpoint check. If you need to check circuit continuity between harness connectors in more detail, such as

when a sub-harness is used, refer to Wiring Diagram in each individual section and Harness Layout for identification of harness connectors.

5. When checking circuit continuity, ignition switch should be OFF.

6. Before checking voltage at connectors, check battery voltage.

7. After accomplishing the Diagnostic Procedures and Electrical Components Inspection, make sure that all harness connectors are reconnected as

they were.

Introduction

INTRODUCTION

In general testing electrical circuits is an easy task if it is approached in a logical and organized method. Before beginning it is important to have all
available information on the system to be tested. Also get a thorough understanding of system operation. Then you will be able to use the appropriate
equipment and follow the correct test procedure.

OPEN:

A circuit is Open when there is no continuity through a section of the circuit. 

SHORT: There are two types of shorts.

SHORT CIRCUIT - When a circuit contacts another circuit and causes the normal resistance to change.
SHORT TO GROUND - When a circuit contacts a ground source and grounds the circuit.

You may have to simulate vehicle vibrations while testing electrical components. Gently shake the wiring harness or electrical component to do this.

NOTE: Refer to "HOW TO CHECK TERMINAL" to probe or check terminal.

See: Diagrams/Diagnostic Aids/How to Check Terminals

Testing For "Opens" In the Circuit

TESTING FOR "OPENS" IN THE CIRCUIT

Before you begin to diagnose and test the system you should rough sketch a schematic of the system. This will help you to logically walk through the
diagnosis process. Drawing the sketch will also reinforce your working knowledge of the system.

Continuity Check Method

The continuity check is used to find an open in the circuit. The Digital Multimeter (DMM) set on the resistance function will indicate an open circuit as
over limit (no beep tone or no ohms symbol). Make sure to always start with the DMM at the highest resistance level.

Diagram Information and Instructions|Page 5845 > < Diagram Information and Instructions|Page 5843