nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Control Valve Assembly and Accumulators|Page 7909 > < Control Valve Assembly and Accumulators|Page 7907
Page 8
background image

a. Place oil circuit of upper body face up. Install steel balls in their proper positions.

b. Install reamer bolts from bottom of upper body.

c. Place oil circuit of lower body face up. Install orifice check spring, orifice check valve and pilot filter.

d. Install separator plate on lower body.
e. Install and temporarily tighten support plates, fluid temperature sensor and tube brackets.

Control Valve Assembly and Accumulators|Page 7909 > < Control Valve Assembly and Accumulators|Page 7907