nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Engine Block Heater > < Torque Specifications|Page 1460
Page 4
background image

Fig. 90  Intake Manifold Bolt Tightening Sequence. 1990-93 Pathfinder & Pickup

b. Tighten intake manifold attaching bolts in sequence, Figs. 88, 89 and 90 to specifications in 2 or 3 steps.
c. On 1992 Maxima with VE30DE engine, refer to TIMING BELT for cylinder head and intake manifold installation.

Engine Block Heater > < Torque Specifications|Page 1460