nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Timing Cover|Specifications|Page 2404 > < Timing Cover|Specifications
Page 1
background image

Timing Cover: Service and Repair

"The content of this article/image reflects the changes identified in TSB NTB 10-046"

ON-VEHICLE REPAIR

FRONT TIMING CHAIN CASE

1. Front timing chain case
2. Seal ring
3. Collared O-ring
4. IVT control valve cover RH
5. Chain tensioner cover
6. Collared O-ring
7. Seal ring
8. IVT control valve cover LH
9. RH engine mounting bracket
10. Water pump cover
11. Water hose clamp 
12. Crankshaft pulley
13. Front oil seal
14. Idler pulley
15. Idler pulley bracket
A. Refer to Installation 
B. To A/C compressor

Removal and Installation

REMOVAL

1. Remove engine under cover.
2. Drain the engine oil.
3. Drain the engine coolant from the radiator.
4. Drain the power steering fluid.
5. Remove engine room cover.
6. Remove front air duct.
7. Remove battery tray.
8. Remove upper radiator hose.
9. Disconnect engine coolant reservoir hose from the radiator and remove engine coolant reservoir.

10. Remove cooling fan assembly.

Timing Cover|Specifications|Page 2404 > < Timing Cover|Specifications