nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Engine Controls - Idle, Base Idle & Timing, Startability|Page 4308 > < Engine Controls - Idle, Base Idle & Timing, Startability|Page 4306
Page 2
background image

2. Connect No.1 ignition coil and No.1 spark plug with suitable high-tension wire as shown, and attach timing light clamp to this wire.
3. Check ignition timing.

Target Idle Speed(*1) No-Load(*3) (in "N" position) M/T: 625 ± 50 rpm

A/T: 700 ± 50 rpm
(in "N" position)

Base idle speed(*2)

No-Load(*3) (in "N" position) M/T: 575±50 rpm

A/T: 650 ±50 rpm
(in "N" position)

NOTE:  
*1 Throttle position sensor harness connector connected.
*2 Throttle position sensor harness connector disconnected or using CONSULT "WORK SUPPORT".
*3 Under the following conditions:

-

Air conditioner switch: OFF

-

Electric load: OFF (Heater, fan & rear window defogger)

CALCULATED LOAD VALUE

Calculated load value % 
(Using CONSULT or GST)

At idle

14.0 - 33.0

At 2,500 rpm

12.0 - 25.0

Engine Controls - Idle, Base Idle & Timing, Startability|Page 4308 > < Engine Controls - Idle, Base Idle & Timing, Startability|Page 4306