nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

General Procedures|Page 13278 > < General Procedures|Page 13276
Page 2
background image

^

Install pipe connector.

^

Observe specified tightening torque when tightening high pressure and low pressure pipe connectors. Excessive tightening will damage threads of
connector or O-ring.

Connector tightening torque:
1) Low pressure side to 27 - 39 Nm (20 - 29 ft. lbs.).
2) High pressure side to 15 - 25 Nm (11 - 18 ft. lbs.).

^

The O-ring in low pressure pipe connector is larger than that in high-pressure connector. Take care to install the proper O-ring.

^

Initially, tighten nut on tie rod outer socket and knuckle arm to 29 - 39 Nm (22 - 29 ft. lbs.). Then tighten further to align nut groove with first pin
hole so that cotter pin can be installed.

CAUTION:  Tightening torque must not exceed 49 Nm (36 ft. lbs.)

^

Before removing lower joint from gear, set gear in neutral (wheels in straight ahead position). After removing lower joint, put matching mark on
pinion shaft and pinion housing to record neutral position.

^

To install, set left and right dust boots to equal deflection. Attach lower joint by aligning matching marks of pinion shaft and pinion housing.

^

Tighten gear housing mounting bracket bolts in the order shown.

Overhaul

General Procedures|Page 13278 > < General Procedures|Page 13276