nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Procedures|Page 3678 > < Procedures|Page 3676
Page 10
background image

6. Install crankshaft sprocket.

^

Install it, with matching mark to timing chain facing front of engine.

7. Install secondary timing chain and camshaft sprocket.

CAUTION:  Matching marks between timing chain and sprockets slip easily. Confirm all matching mark positions repeatedly during the
installation process.

^

Push sleeve of secondary chain tensioner, and keep it pressed with stopper pin.

a. Align matching marks on secondary timing chain (gold link) with the ones on intake and exhaust sprockets (stamped). Then install them.

^

Matching marks of intake sprocket are on back side of secondary sprocket.

^

There are two types of matching marks, round and oval types. They should be used for RH/LH banks respectively.
RH bank: Use round type.
LH bank: Use oval type.

b. Align knock pin and pin hole on camshaft with groove and knock pin on sprocket. Then install them.

^

On intake side, align pin hole on small diameter side of camshaft front end with knock pin on back side of camshaft sprocket. Then install
them.

^

On exhaust side, align knock pin on camshaft front end with pin groove on camshaft sprocket. Then install them.

^

Mounting bolts for camshaft sprockets must be tightened in step 7. Tightening them by hand is enough to prevent dislocation of knock
pins.

Procedures|Page 3678 > < Procedures|Page 3676