nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Engine Controls - MIL ON/DTC P0420 Set|Page 6921 > < Engine Controls - MIL ON/DTC P0420 Set|Page 6919
Page 7
background image

1.

Press [SUB MODE] (see Figure 4) then:

a.

From the listed items, find and select [BATTERY CHARGE].

2.

Check the CONSULT-II's "Charger Input" reading (see Figure 5).

NOTE:

^

"Battery Voltage" is the voltage level of CONSULT-II's battery.

^

Charger Input" is the voltage level of the vehicle's battery. (It must be above 12 volts.)

^

The general procedure includes a list of items to check when "Charger Input" voltage is below 12V.

Step Three: Reprogram the Vehicle ECM

Step Four: "Wrap-up" After Reprogramming is Finished

1.

Turn the ignition switch "OFF" and turn CONSULT-II "OFF".

2.

Wait more than 10 seconds, then;

a.

Turn the ignition switch "ON" for 2 second, then

Engine Controls - MIL ON/DTC P0420 Set|Page 6921 > < Engine Controls - MIL ON/DTC P0420 Set|Page 6919