nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Timing Chain|Diagrams|Page 3450 > < Timing Chain|Diagrams|Page 3448
Page 13
background image

18. Install the front oil seal on the front timing chain case. Apply new engine oil to the oil seal edges.

^

Install it so that each seal lip is oriented as shown in figure.

^

Using a suitable drift, press-fit oil seal until it becomes flush with timing chain case end face.

^

Make sure the garter spring is in position and seal lip is not inverted.

19. Install the water pump cover and the chain tensioner cover to front cover.

^

Apply RTV Silicone Sealant or equivalent. 

20. Install front timing chain case as follows:

a. Apply liquid gasket to front timing chain case back side as shown.
b. Install dowel pin on the rear timing chain case into dowel pin hole on front timing chain case.

Timing Chain|Diagrams|Page 3450 > < Timing Chain|Diagrams|Page 3448