c. Tighten bolts to the specified torque in order shown in the figure.

8 mm (0.31 inch) dia. bolts : 1, 2
25.5 - 31.3 Nm (2.6 - 3.2 kgf-cm, 19 - 23 ft. lbs.) 
6 mm (0.24 inch) dia. bolts : Except the above 11.7 - 13.7 Nm (1.2 - 1.4 kgf-cm, 9 - 10 ft. lbs.) 

d. After tightening, retighten them to specified torque in numerical order shown in figure.

21. After installing the front timing chain case, check the surface height difference between the following parts on the oil pan mounting surface. If not

within specification, repeat the installation procedure.
Standard
Front timing chain case to rear timing chain case: -0.14 to 0.14 mm (-0.005 to 0.0055 inch) 

22. Install RH and LH intake valve timing control covers as follows:

a. Install seal rings in shaft grooves.
b. Apply liquid gasket to the intake valve timing control covers.

^

Use Genuine RTV Silicone Sealant or equivalent. 

c. Install collared O-ring in front cover oil hole (LH and RH sides).