nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Positive Crankcase Ventilation > < Refueling Vapor Cut Valve|Testing and Inspection
Page 2
background image

d. Apply vacuum pressure to hose end [-13.3 kPa (-100 mmHg-3.94 inHg)] with fuel gauge retainer remaining open and check that the

pressure is applicable.

Positive Crankcase Ventilation > < Refueling Vapor Cut Valve|Testing and Inspection