nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

A/T Controls - Reprogram TCM After CVT Replacement|Page 11373 > < A/T Controls - Reprogram TCM After CVT Replacement|Page 11371
Page 3
background image

CAUTION:

For number 2 and number 3, DO NOT connect the CONSULT-II A/C Power Supply.

2.

Press [SUB MODE] (see Figure C) then:

a.

From the listed items, find and select [BATTERY CHARGE].

3.

Check the CONSULT-II's "Charger Input" reading (see Figure D).

NOTE:

^

"Battery Voltage" is the voltage level of CONSULT-II's battery.

A/T Controls - Reprogram TCM After CVT Replacement|Page 11373 > < A/T Controls - Reprogram TCM After CVT Replacement|Page 11371