nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Customer Interest:|06-084 > < A/T, Engine Controls - Low Power/No MIL/DTC P0868|Page 12000
Page 11
background image

3.

Check the CONSULT-II's "Charger Input" reading (see Figure D).

NOTE:

^

"Battery Voltage" is the voltage level of CONSULT-II's battery.

^

"Charger Input" is the voltage level of the vehicle's battery. (It must be above 12 volts.)

Step Three: Reprogram the TCM

Step Four: TCM Reprogramming "Wrap-up"

1.

Turn the ignition and CONSULT-II OFF.

2.

Disconnect CONSULT-II from the vehicle.

3.

Start the Engine and make sure the MIL is OFF.

^

If it's still ON, use CONSULT-II with the Diagnostic (red/white) Card to erase any DTC's that may have stored in the TCM and/or the ECM
during the reprogramming procedure.

4.

Confirm there are no leaks from the transmission. Test-drive the vehicle and make sure the transmission operates correctly in all modes and has a
normal power level when starting from a stop.

See the AT section of the appropriate Service Manual for operation specifications.

Customer Interest:|06-084 > < A/T, Engine Controls - Low Power/No MIL/DTC P0868|Page 12000