nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Deployment and Disposal|Page 12382 > < Deployment and Disposal
Page 2
background image

1. Firmly grip pre-tensioner in a vise and cut off the webbing.

2. Connect deployment tool [SST: KV99106400 (J38381)] and deployment tool adapter [SST: KV99110500 (J38381-80)] yellow connector to front

seat belt pre-tensioner.

3. Connect red clip of deployment tool to battery positive terminal and black clip to negative terminal.
4. The lamp on the right side of the tool, marked "deployment tool power", should glow green, not red.
5. Press the button on the deployment tool. The left side lamp on the tool, marked "seat belt pre-tensioner connector voltage", will illuminate and the

seat belt pre-tensioner will deploy.

CAUTION:  When deploying the front seat belt pre-tensioner, stand at least 5 m (16 ft) away from the seat belt pre-tensioner.

Checking Deployment Tool

CHECKING DEPLOYMENT TOOL

Connecting to Battery

Deployment and Disposal|Page 12382 > < Deployment and Disposal